Managing rides
Add completed rides, plan future rides, and keep their routes, recordings and results together in My Rides.
Choose how to add a ride
Select Import or add. Under Ridden it?, import the ride from Strava or RideWithGPS; under Planning one?, Find an event. Add it by hand, at the foot, is for a ride with no recording that isn’t in the calendar. Only connected services offer imports; to connect one, add it in Sign-in and your data in your Account. With none connected, the button reads Add Ride. Import a recorded ride first to avoid adding it twice.
Import or add opens a modal on desktop and a bottom drawer on phones. Choose how you want to add the ride.
Adding a ride manually
Choose "Add it by hand" ("Add by hand" with no service connected), then fill in these key fields:
- Ride name is the name of the ride, for example the event or permanent name.
- Date is the date you rode (or plan to ride). The date determines which Audax season the ride falls in and affects award eligibility windows.
- Distance is the ride distance in kilometres. For BRM rides, standard distance categories apply (200 km, 300 km, 400 km, 600 km, 1,000 km).
- Ride Type sets the kind of ride: BRM, Permanent, RM, Flèche, Flèche de France, PBP, or BP. It appears once you enter a distance and offers only the types that fit it. The ride type determines which awards the ride can count towards.
Fill in the required fields, then select Next for location and additional details. You can attach a RideWithGPS route or GPX file.
Tip: You will not find SR600 as a ride type to select. The tracker derives it from distance, ride type, and elevation gain. A permanent of roughly 600 km with at least 10,000 m of climbing is classified as an SR600 Original. For the modern SR600 format, add a roughly 600 km ride as a BRM and enter at least 8,000 m of elevation.
A future date creates a planned ride. See ride statuses for what happens after you ride it.
Enter the main ride details and select a ride type. Next becomes available when the required fields are complete.
Import from Strava or RideWithGPS
Search your recordings, check the proposed matches and choose what to import. You can correct details or combine recordings before adding them. The importing guide covers the steps.
CSV import & export
Export your rides as a CSV file for a backup, update them in a spreadsheet, or load a season of historical rides at once. The Import & export guide explains how.
Creating a planned ride from the calendar
Your choices in Account control the calendar: Events shows your selected organisations or countries, and World shows the rest. Permanents appears when Audax Ireland is selected. Use an event’s + button to plan it. A permanent asks for a date, and a start location if it passes through more than one county; a Flèche asks for your team’s start county.
Select the + button on an event to add it to your planned rides.
Planned rides appear soonest first. After the date passes, My Rides asks how it went: Finished, DNF or Didn’t ride. Didn’t ride removes the plan. A finished ride can count towards awards before its homologation number arrives. My Rides also tells you when a planned event is cancelled, postponed or moved to another date.
Choose where your team starts, rather than the shared finish location, when adding a Flèche.
Event time limits
Open an event or expand its card for its route, organiser and time limit. A limit such as 40h (1d 16h) is the permitted time, not your predicted finish time.
Difficulty uses the published rating where available, otherwise climbing per 100 km. Check the organiser’s information when planning your ride.
Expand an event to check its time limit. Longer limits also show the equivalent days and hours.
Permanents
Choose a route on Calendar → Permanents. Select Plan ride on the desktop map, or + beside the route. Set the date, and the start location if the route passes through more than one county; you can change these later on the ride.
Planning a ride does not enter you for it. Use the linked Audax Ireland entry form before riding and the completion form afterwards. Saved Account details can fill in these forms; check and submit them on the form’s site.
For a qualifying Flèche de France route, choose Flèche de France (Gold/Silver); Dieppe is excluded. These rides add distance to ACP 5000/10000 but do not replace a required BRM or team Flèche. Add the homologation number when available.
Browse permanent routes and add them as rides from the Permanents tab.
Choose your planned date, and where you start, before adding the permanent to your rides.
Filtering
Search by name, place or organiser, then narrow by distance and location. Events also offer month and previous seasons; permanents offer start/pass-through location and difficulty. On a phone, open Filters.
Finding rides in the World calendar
Open the World tab for events outside your calendar selections. Filter by type, continent, country, distance or month.
World brings BRMs abroad and RM events together. These example listings show how countries, distances and climbing appear.
BRM 600 with 8,000 m finds the rides the tracker calls SR600 Modern. It excludes events with no recorded climb and SR600 Original mountain permanents.
Choose a type and region to narrow the World calendar. On a phone, open Filters, then select Show results.
World remembers your region across devices when signed in, or in this browser when signed out. A shared link can open a different selection. Clear the filters to browse everywhere.
Use Include previous seasons and Season for older events. Open a month and select Show more to load further events. Coverage varies by country and year.
Confirm dates and entry details on the organiser’s page before booking travel. Adding an event to My Rides does not enter you for it.
An event page flags nearby dates you already have planned and may link an old event to its newer edition.
Award contributions
Potential awards shows what an event could help you earn. After you plan it, Projected awards shows its effect on your progress.
Finding your rides
Planned lists upcoming rides; Ridden lists past rides, including DNFs when shown. Your last selected tab is remembered.
Use Search & Filter beside the list, or the filter button on a phone. Search covers planned and ridden rides together. Filter by type, distance, season or missing homologation number, and change the sort order.
Desktop shows 15 rides per page by default; Rides per page offers 15, 25 or 50. On a phone, Show more loads another 20.
Planned lists upcoming rides. Switch to Ridden for your completed and other past ride records.
Use the desktop filter sidebar or the Search and filter button to open the phone drawer. Select Show rides to return to the list.
DNF visibility
Turn Show DNF rides on or off in Search & Filter. The choice is saved to your account.
The homologation number
Finished BRMs, RMs, PBP rides and Flèches count towards awards while their official homologation number is missing. The orange no number badge reminds you to add it when published.
On desktop, use the pencil on a ride row. On a phone, expand the ride and select Add number. Enter the number in Additional Info and save.
Saving the homologation number removes the orange badge.
For several BRMs, open the ACP homologation importer in Settings → Imports in your Account. Paste the results from your ACP account, review the matches and import the selected numbers.
Regular permanents do not receive a homologation number. SR600 Original is an exception.
Tip: ACP results can take a few weeks to appear. If a ride is missing, check that the three Irish ACP clubs are in your ACP account, give a newly added club a day or so, then contact the organiser if needed. Checking your results explains the full process.
Past rides that get a number include the Homologation Number field on the Additional Info step.
Ride details, notes, and award contributions
Expand a ride for its summary, then select View ride for the full record. On desktop you can also select its name.
The ride summary appears first. Award contributions sit beside the main content on desktop. Scroll for recordings, the route and notes.
The detail page includes its route, organiser, recordings, notes, history and award contributions. Completed rides show what counts now; planned rides show projections.
Mark as DNF on the ride page records that you did not finish a completed ride; a claim using the ride can prevent it. Use Add notes or Edit notes for anything you want to remember. Notes also appear in expanded past rides and in CSV exports.
Expand a row for a quick summary, then select View ride for the full record.
Recordings and the brevet section
Strava activities and RideWithGPS trips add recorded distance, timing and climbing. If a recording includes travel to or from the event, review the suggested brevet section or adjust its ends. Full recording shows the whole activity; Back to brevet section returns to the event portion. These measurements do not replace the ride’s award distance.
Your route shows the saved GPX or linked recording, with a download where available.
For award cards with your rides and routes, see Achievements & sharing.
Ride weather
Select Open ride weather on a planned ride with a route. A past ride shows a snapshot of the weather on the day. The Ride weather guide explains start time, pace and forecasts.
Deleting a ride
Use the delete icon on the ride page, then confirm Delete. A claim may lock a ride against deletion; the disabled action explains why.